Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 11/15/2024 Category: Coastal Current Phase: Design Development
Design, permit, and construct a maintenance dredge event within the Pirate Harbor waterway system. This project will include construction oversight with post dredge bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.South Gulf Cove Parallel Locks Project
Last Updated: 11/15/2024 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 11/12/2024 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 11/12/2024 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cochran Boulevard at Veterans Boulevard Intersection Improvments
Last Updated: 11/12/2024 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 11/12/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionLast Updated: 11/12/2024 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayPeachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 11/12/2024 Category: Roadway Category: Sidewalks Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 11/12/2024 Category: Roadway Current Phase: Design Development
Sandhill Blvd Widening